Bond 2020 Projects

The Bond 2020 logo displayed in blue and brown colors, symbolizing unity and collaboration.

  • Brazos Crossing

    Upgrade Fire Alarm

    Development Center

    IDF & MDF A/C Retrofit

    Rosenberg Transportation Renovations

    Repair roof

    Add Training Room, Office Space and High Bay for Bus Lift

    Replace Bus Canopies

    Replace Door Hardware and Re-Key Facility

    Re-Carpet Offices

    Add Lighting to the Shop Area

    ALC/1621 Additions (Complete)

    Fulshear Transportation Visual Recording (Complete)

  • Lamar CHS, Lamar JHS, Pink ES, Smith ES, Long ES Additions & Renovations

    Lamar CHS - Provide Handrail for Ramp in Auditorium

    Lamar CHS - Upgrade HVAC System Including Central Plant Chiller Replacement

    Lamar CHS - Add Security System

    Lamar CHS - New PA and Classroom Communication System

    Lamar CHS - New Orchestra Room

    Lamar CHS - Replace Roof

    Lamar JHS - Replace Chalk Boards with White Boards

    Lamar JHS - Upgrade LED Lighting

    Lamar JHS - Renovate Entry Vestibule; Move Second Store Front Up

    Lamar JHS - Replace Roof

    Lamar JHS - Football Field Upgrades

    Pink ES - Install VFD on Heating water Pumps

    Pink ES - Replace Heating Water Piping and Heating Water Pumps

    Pink ES - Upgrade LED Lighting

    Pink ES - Replace Roof; replace metal panel roofing & waterproof seal at Corridor windows

    Pink ES - Repair Concrete Drive

    Smith ES - Replace all Split System A/C Units

    Smith ES - Upgrade LED Lighting

    Smith ES - New PA and Classroom Communication System

    Long ES - Add New Sidewalk and Repair Existing Sidewalks

    Long ES– Repair Roof

    Wessendorff MS Renovations

    Wessendorff MS - Address Foundation Issue; Repair Sanitary Lines; drinking fountain

    Wessendorff MS - Replace Roof

    Wessendorff MS - Repair Broken Sidewalk

    Wessendorff MS - New PA and Classroom Communication System

    Seguin Early Childhood Center Additions & Renovations

    Seguin ECC - New Secure Vestibule Addition

    Seguin ECC - Renovate Kitchen and Serving Lines

    Lamar CHS Tennis Courts (Complete)

    Austin ES Additions & Renovations (Complete)

    New Security Vestibule

    Add curtain to stage; renovate student restrooms; repair walls and floors due to leveling; replace doors and hardware; video and repair sanitary sewer lines; video access control; replace sound system

  • Foster HS, Briscoe JHS, Wertheimer MS Additions & Renovations

    Foster HS – Address Foundation Issues

    Foster HS - Address Tectum Panels

    Foster HS - Replace Chilled Water Pumps

    Foster HS - New Signage

    Foster HS - New intercom System

    Foster HS - Replace Foodservice Equipment

    Foster HS - Replace Roof

    Foster HS - Add Orchestra Room

    Briscoe JHS - Address Foundation Issues; Upgrade HVAC System

    Briscoe JHS - Replace Chillers, Pumps, Boilers, Condenser Pumps and Piping

    Briscoe JHS - New PA and Classroom Communication System

    Briscoe JHS - New Projection System in Forum

    Briscoe JHS - Replace Roof

    Briscoe JHS - Add Orchestra Room

    Wertheimer MS - Investigate Sanitary Service Lines

    Wertheimer MS - Provide Safe, Secure Entry

    Wertheimer MS - Replace Roof

    Frost ES Renovations

    Waterproof and Seal

    Replace Ceiling and Grid

    Replace Carpet

    Replace Vinyl Wall Covering

    Repair Cracks in Cafeteria

    Replace Playground Fence

    Install VFD on Heating Water Pump; Replace Boiler, Heating Water

  • George Ranch HS, Reading JHS Additions & Renovations

    George Ranch HS - Repair Concrete Drive

    George Ranch HS - Repair Roof

    George Ranch HS - Add Parking Lot Lighting

    George Ranch HS - Repair CMU Wall in Corridor by Stage

    George Ranch HS - Add Orchestra Room

    Reading JHS - Repair Concrete Drive

    Reading JHS - Repair Roof

    Reading JHS - Add Orchestra Room

    Dickinson ES, Williams ES Communication Upgrades

    Dickinson ES - Upgrade LED lighting

    Dickinson ES - New PA and classroom communication system

    Williams ES - New PA and classroom communication system

    Dickinson ES, Campbell ES & Williams ES Add. & Renovations (Complete)

    Williams ES – Add parent drop-off canopy

    Williams ES – Add new concrete bus drive; replace exterior windows

    Dickinson ES - Repair concrete sidewalk and curb

    Campbell ES - Replace chalk boards with white boards; address foundation issues; install VFD on heating water pumps; replace heating water piping and heating water pumps

    Dickinson ES & Campbell ES Re-Roof (Complete)

    Dickinson ES – Replace Roof

    Campbell ES– Replace Roof

  • Fulshear HS, Leaman JHS Orchestra Additions

    Fulshear HS Orchestra Addition

    Leaman JHS Orchestra Addition

    Huggins ES Additions & Renovations (Complete)

    Replace sanitary sewer lines; upgrade LED lighting; sound system

    Replace roof; replace exterior windows, access control near portables

    New Secure Vestibule Addition

  • Terry HS & George JHS  Renovations

    Terry HS- Replace roof; metal roof; repair leaks in auditorium

    Terry HS - new water lines and water fountains

    Terry HS - Rekey interior building

    Terry HS - Upgrade HVAC System

    Terry HS - Add lights in library

    Terry HS - Upgrade electrical distribution

    Terry HS - Add Orchestra Room

    George JHS - Remove wall in Ag Shop; renovate choir; renovate all flooring;

    George JHS - Replace casework; replace exterior doors in athletic area;

    George JHS - Replace VCT in cafeteria with porcelain tile; upgrade LED lighting;

    George JHS - Replace sanitary lines in kitchen and boys’ locker room.

    George JHS - Replace Roof

    George JHS - Replace Serving Line Doors

    George JHS - Add Orchestra Room

    Navarro MS, Taylor Ray ES, Meyer ES Additions & Renovations

    Meyer ES - Add Security Vestibule

    Meyer ES - Repair CMU Walls in Gym

    Meyer ES - Install New Fencing

    Meyer ES - Upgrade LED Lighting

    Navarro MS - Add Security Vestibule

    Navarro MS - Replace Ceiling in Library

    Navarro MS - Repair Floor Cracks Throughout

    Navarro MS - Replace Hand Sinks

    Navarro MS - Replace Door Hardware

    Navarro MS - Replace Computer Lab Casework

    Navarro MS - Upgrade LED Lighting

    Navarro MS - Replace Roof

    Navarro MS - Add ADA Access Ramp

    Taylor Ray ES - Add Security Vestibule

    Taylor Ray ES - Replace Roof

    Taylor Ray ES - Replace Exterior Doors

    Taylor Ray ES - Additional Fencing

    Travis ES Additions & Renovations

    Expand Computer Lab

    Expand Library

    Repair Roof

    Provide Restroom for Classroom 6

    Replace Ceiling Tile and Grid

    Upgrade LED Lighting; Address Safety Issues

    Replace Distribution Panel

    Replace Drinking Fountains in Main Hall

    Provide Security Alarm

    New PA and Classroom Communication System

    Correct Site Drainage; Reset Inlets to Drain

    Replace Asphalt Basketball Court

    Provide ADA Playground Ramp

    Replace Exterior Doors and Windows

    Bowie ES & Beasley ES Additions & Renovations (Complete)

    Bowie ES- Repair walls; replace exterior windows; renovate restrooms; replace boiler, fan coil units, air handlers and split system A/C’s; replace intercom; upgrade LED lighting

    Bowie ES- New Secure Vestibule Addition

    Bowie ES - Install ADA playground ramp; replace exterior doors and windows

    Beasley ES - Repair gym floor; replace ceiling in portable; install ADA playground ramp; replace stage curtain; replace casework in teacher’s lounge; upgrade circuit breakers and LED lighting

    Beasley ES - New Secure Vestibule Addition

    Jackson ES Additions & Renovations (Complete)

    Repair structural issues; upgrade LED lighting; upgrade electrical panel; sound system/additional cameras

    Replace roof; replace wall cladding; replace exterior windows

    New Secure Vestibule Addition

    Jackson ES Playground (Complete)

Project Information

  • Adriane Gray Elementary School

    5055 Sunrise Meadow Dr.
    Richmond, TX 77469
    Architect of Record: VLK Architects
    General Contractor: Drymalla Construction
    Completion Date: July 2023

     

    a photo of building way and pathway

  • Viola Gilmore Randle Elementary School

    5902 Sycamore Ranch Lane
    Fulshear, Texas 77441

    Architect of Record: VLK Architects
    General Contractor: Joeris General Contractors
    Estimated Completion Date:  April 2024

    Aerial view of a new school construction site, showcasing the building's framework and surrounding landscape.

     


     

  • Willie Melton, Sr. Elementary School


    2880 Jordan Ranch Blvd.
    Brookshire, Texas 77423
    Architect of Record: VLK Architects
    General Contractor: Drymalla Construction
    Estimated Completion Date: April 2024

     Overhead perspective of a school under construction, highlighting the structural progress and site layout.

  • James Steenbergen Middle School


    Architect of Record: PBK Architects 
    General Contractor: Sterling Structures
    Estimated Completion Date: March 2024

    A construction site showcasing the new school building in progress, with scaffolding and construction materials visible.

  • Gene Tomas High School


    Architect of Record:  PBK Architects
    Estimated Completion Date:  June 2025


    A construction site for a new school is set in a vast field, showcasing machinery and building materials in progress.

    Ella Banks Junior High School
    Architect of Record:  PBK Architects
    Estimated Completion Date:  June 2025

  • Transportation Center #3


    Architect of Record: ERO/IN2
    Estimated Completion Date: TBD

     Future site of Lamar CISD, showcasing plans for educational development and community growth in the area.

     

  • Police Station


    Architect of Record: PBK Architects
    General Contractor: TBD
    Estimated Completion Date: TBD

  • Brazos Crossing Fire Alarm Upgrade
    Architect of Record:TBD
    Contractor of Record: TBD
    Completion Date:TBD

  • Development Center
    Architect of Record:  Corgan Architects
    General Contractor:  TBD
    Estimated Completion Date:  July 202

  • IDF/MDF A/C Retrofit
    Architect of Record: Goero International 
    General Contractor: Texas AirSystems
    Estimated Completion Date: TBD

     A cluttered rack filled with various wires and cables organized within a room setting.

  • Rosenberg Transportation Renovations
    Architect of Record: Corgan Architects
    Contractor of Record: Gilbane
    Completion Date:  July 2024


    Aerial view of a school bus depot featuring multiple buses parked in organized rows under clear skies.

  • Lamar CHS, Lamar JHS, Pink ES, Smith ES, Long ES Additions & Renovations


    Architect of Record:  Corgan Architects
    General Contractor: Gilbane
    Estimated Completion Date:  July 2024

     Overhead perspective of a newly constructed school building, highlighting its design and outdoor area.

  • Wessendorff MS Renovations

    Architect of Record:  PBK Architects
    General Contractor: Sterling Structures
    Estimated Completion Date:  August 2023

     

  • Seguin Early Childhood Center Additions & Renovations


    Architect of Record:  PBK Architects
    General Contractor:  Jamail & Smith
    Estimated Completion Date: December 2023

    Exterior of a school building showcasing a clear sign labeled "school" at the front entrance

  • Terry HS and George JHS Additions & Renovations


    Architect of Record: VLK Architects
    General Contractor: Drymalla Construction
    Estimated Completion Date:  October 2024


     Overhead perspective of a school building with adjacent parking lots, highlighting the structure and its environment.

  • Navarro MS, Taylor Ray ES, Meyer ES Additions & Renovations
    Architect of Record: PBK Architects 
    General Contractor: Bass Construction
    Estimated Completion Date: November 2023

    A large room cluttered with an abundance of boxes, showcasing a busy storage or packing area.

  • Travis Elementary Additions and Renovations


    Architect of Record:  Corgan Architects
    Contractor of Record:  Jamail and Smith
    Estimated Completion Date:  July 2024

     Construction workers diligently labor on a building, surrounded by scaffolding for support and safety.

  • Foster HS, Briscoe JHS, Wertheimer MS Additions & Renovations


    Architect of Record: PBK Architects 
    General Contractor: M Scott Construction
    Estimated Completion Date: July 2024


     Aerial view of a construction site showcasing extensive dirt and earthworks in progress.

  • Frost Renovations


    Architect of Record: IN2 Architects
    Contractor of Record: Jamail & Smith
    Estimated Completion Date: December 2023

     

    Aerial view of a school building showcasing its roof and surrounding landscape, highlighting its architectural design.

  • George Ranch HS, Reading JHS Additions & Renovations


    Architect of Record: PBK Architects 
    General Contractor: Bass Construction
    Estimated Completion Date: July 2024

     

    Bird's-eye view of a construction site, highlighting a building being built with cranes and construction materials around.

  • Dickinson ES, Williams ES Communication Upgrades

    Architect of Record: Joiner Architects
    General Contractor: Jamail & Smith
    Estimated Completion Date: TBD

    Aerial view of a school building showcasing its roof and surrounding area, highlighting its structure and layout.

  • Orchestra Additions

    Architect of Record: PBK Architects
    General Contractor: Bass Construction
    Estimated Completion Date:  July 2024

    A bright room featuring multiple large windows and a ladder leaning against the wall, inviting natural light inside.


     

  • ALC/1621 Additions

    Architect of Record: VLK Architects
    General Contractor:  Bass Construction
    Estimated Completion Date: March 2022
    The main entrance of the school, showcasing its doors and steps, inviting students and visitors inside.

  • Fulshear Transportation Visual Recording

    Contractor of Record:  Knight Security Systems
    Completion Date: June 2022

  • Lamar CHS Tennis Courts


    Architect of Record: PBK Architects
    Contractor of Record:  Sterling Structures
    Completion Date: October 2022

    Two guys are busy painting a court with a roller, adding fresh color to the surface on a sunny day.

    Blue painted tennis court

  • Austin ES Additions & Renovations
    (including Vestibules)

    Architect of Record: PBK Architects
    General Contractor: Bass Construction
    Estimated Completion Date:  March 2023

    A spacious room featuring two doors and a large map prominently displayed on the wall.

  • Bowie and Beasley Additions & Renovations

    Architect of Record: Corgan Architects
    General Contractor: Bass Construction
    Estimated Completion Date:  January 2023

    A modern fire station stands proudly at the corner of a bustling street, ready to serve the community.

  • Jackson ES Additions & Renovations
    (including Vestibules)

    Architect of Record: Corgan Architects
    General Contractor: Jamail & Smith
    Estimated Completion Date:  January 2023

     A deserted hallway featuring a striking red floor, creating a bold and vibrant atmosphere.

  • Jackson ES Playground

    Contractor of Record:  McKenna Contracting
    Estimated Completion Date: March 2022

  • Dickson, Campbell & Williams ES

    Architect of Record: Joiner Architects
    General Contractor: Sterling Structures
    Estimated Completion Date:  July 2022

    Williams Parent Loop

    Aerial view of a highway winding through a lush park surrounded by vibrant green trees.

                                                                                     

  • Dickinson ES & Campbell ES Re-Roofing
    Architect of Record:  Beam
    General Contractor:  Dickinson - Argio Roofing & Construction; Campbell - Tadco Roofing
    Estimated Completion Date:  Dickinson January 2023; Campbell December 2022

    Aerial view of a school building surrounded by a spacious parking lot, showcasing the layout and surroundings.

  • Huggins ES Additions & Renovations
    (including Vestibules)

    Architect of Record: PBK Architects
    General Contractor: M Scott Construction
    Estimated Completion Date:  March 2023

     The front view of a building topped with a flag, symbolizing pride and community spirit.

  • Randle HS Shell Space Build Out
    Architect of Record: PBK Architects
    Completion Date: June 2021