2020 Bond Projects


NEW FACILITIES

Adriane Gray ES (Opened August 2023)

Viola Gilmore Randle ES (Opens August 2024)

Willie Melton, Sr. ES (Opens August 2024)
James Steenbergen MS (Opens August 2024)

Gene Tomas HS & Ella Banks JHS (Opens August 2025)

Transportation Center #3

Police Station

 

DISTRICT-WIDE

Brazos Crossing
    a.  Upgrade Fire Alarm
Development Center
IDF & MDF A/C Retrofit

Rosenberg Transportation Renovations

     a.  Repair roof
     b.  Add Training Room, Office Space and High Bay for Bus Lift
     c.  Replace Bus Canopies
     d.  Replace Door Hardware and Re-Key Facility
     e.  Re-Carpet Offices
     f.   Add Lighting to the Shop Area


BLUE TRACK

Lamar CHS, Lamar JHS, Pink ES, Smith ES, Long ES Additions & Renovations

  1. Lamar CHS - Provide Handrail for Ramp in Auditorium
  2. Lamar CHS - Upgrade HVAC System Including Central Plant Chiller Replacement
  3. Lamar CHS - Add Security System
  4. Lamar CHS - New PA and Classroom Communication System
  5. Lamar CHS - New Orchestra Room
  6. Lamar CHS - Replace Roof
  7. Lamar JHS - Replace Chalk Boards with White Boards
  8. Lamar JHS - Upgrade LED Lighting
  9. Lamar JHS - Renovate Entry Vestibule; Move Second Store Front Up
  10. Lamar JHS - Replace Roof
  11. Lamar JHS - Football Field Upgrades
  12. Pink ES - Install VFD on Heating water Pumps
  13. Pink ES - Replace Heating Water Piping and Heating Water Pumps
  14. Pink ES - Upgrade LED Lighting
  15. Pink ES - Replace Roof; replace metal panel roofing & waterproof seal at Corridor windows
  16. Pink ES - Repair Concrete Drive
  17. Smith ES - Replace all Split System A/C Units
  18. Smith ES - Upgrade LED Lighting
  19. Smith ES - New PA and Classroom Communication System
  20. Long ES - Add New Sidewalk and Repair Existing Sidewalks
  21. Long ES– Repair Roof

Wessendorff MS Renovations

  1. Wessendorff MS - Address Foundation Issue; Repair Sanitary Lines; drinking fountain
  2. Wessendorff MS - Replace Roof
  3. Wessendorff MS - Repair Broken Sidewalk
  4. Wessendorff MS - New PA and Classroom Communication System

Seguin Early Childhood Center Additions & Renovations

  1. Seguin ECC - New Secure Vestibule Addition
  2. Seguin ECC - Renovate Kitchen and Serving Lines

RED TRACK

Terry HS & George JHS  Renovations

      a. Terry HS- Replace roof; metal roof; repair leaks in auditorium
      b. Terry HS - new water lines and water fountains
      c. Terry HS - Rekey interior building
      d. Terry HS - Upgrade HVAC System
      e. Terry HS - Add lights in library
       f. Terry HS - Upgrade electrical distribution
      g. Terry HS - Add Orchestra Room
      h. George JHS - Remove wall in Ag Shop; renovate choir; renovate all flooring;
       i. George JHS - Replace casework; replace exterior doors in athletic area;
       j. George JHS - Replace VCT in cafeteria with porcelain tile; upgrade LED lighting;
      k. George JHS - Replace sanitary lines in kitchen and boys’ locker room.
       l. George JHS - Replace Roof
     m. George JHS - Replace Serving Line Doors
      n. George JHS - Add Orchestra Room

Navarro MS, Taylor Ray ES, Meyer ES Additions & Renovations

  1. Meyer ES - Add Security Vestibule
  2. Meyer ES - Repair CMU Walls in Gym
  3. Meyer ES - Install New Fencing
  4. Meyer ES - Upgrade LED Lighting
  5. Navarro MS - Add Security Vestibule
  6. Navarro MS - Replace Ceiling in Library
  7. Navarro MS - Repair Floor Cracks Throughout
  8. Navarro MS - Replace Hand Sinks
  9. Navarro MS - Replace Door Hardware
  10. Navarro MS - Replace Computer Lab Casework
  11. Navarro MS - Upgrade LED Lighting
  12. Navarro MS - Replace Roof
  13. Navarro MS - Add ADA Access Ramp
  14. Taylor Ray ES - Add Security Vestibule
  15. Taylor Ray ES - Replace Roof
  16. Taylor Ray ES - Replace Exterior Doors
  17. Taylor Ray ES - Additional Fencing

Travis ES Additions & Renovations

  1. Expand Computer Lab
  2. Expand Library
  3. Repair Roof
  4. Provide Restroom for Classroom 6
  5. Replace Ceiling Tile and Grid
  6. Upgrade LED Lighting; Address Safety Issues
  7. Replace Distribution Panel
  8. Replace Drinking Fountains in Main Hall
  9. Provide Security Alarm
  10. New PA and Classroom Communication System
  11. Correct Site Drainage; Reset Inlets to Drain
  12. Replace Asphalt Basketball Court
  13. Provide ADA Playground Ramp
  14. Replace Exterior Doors and Windows

GOLD TRACK

Foster HS, Briscoe JHS, Wertheimer MS Additions & Renovations

  1. Foster HS – Address Foundation Issues
  2. Foster HS - Address Tectum Panels
  3. Foster HS - Replace Chilled Water Pumps
  4. Foster HS - New Signage
  5. Foster HS - New intercom System
  6. Foster HS - Replace Foodservice Equipment
  7. Foster HS - Replace Roof
  8. Foster HS - Add Orchestra Room
  9. Briscoe JHS - Address Foundation Issues; Upgrade HVAC System
  10. Briscoe JHS - Replace Chillers, Pumps, Boilers, Condenser Pumps and Piping
  11. Briscoe JHS - New PA and Classroom Communication System
  12. Briscoe JHS - New Projection System in Forum
  13. Briscoe JHS - Replace Roof
  14. Briscoe JHS - Add Orchestra Room
  15. Wertheimer MS - Investigate Sanitary Service Lines
  16. Wertheimer MS - Provide Safe, Secure Entry
  17. Wertheimer MS - Replace Roof

Frost ES Renovations

  1. Waterproof and Seal
  2. Replace Ceiling and Grid
  3. Replace Carpet
  4. Replace Vinyl Wall Covering
  5. Repair Cracks in Cafeteria
  6. Replace Playground Fence
  7. Install VFD on Heating Water Pump; Replace Boiler, Heating Water

MAROON TRACK

George Ranch HS, Reading JHS Additions & Renovations

  1. George Ranch HS - Repair Concrete Drive
  2. George Ranch HS - Repair Roof
  3. George Ranch HS - Add Parking Lot Lighting
  4. George Ranch HS - Repair CMU Wall in Corridor by Stage
  5. George Ranch HS - Add Orchestra Room
  6. Reading JHS - Repair Concrete Drive
  7. Reading JHS - Repair Roof
  8. Reading JHS - Add Orchestra Room

Dickinson ES, Williams ES Communication Upgrades

  1. Dickinson ES - Upgrade LED lighting
  2. Dickinson ES - New PA and classroom communication system
  3. Williams ES - New PA and classroom communication system

PURPLE TRACK

Fulshear HS, Leaman JHS Orchestra Additions

  1. Fulshear HS Orchestra Addition
  2. Leaman JHS Orchestra Addition

DISTRICT WIDE

ALC/1621 Additions (Complete)

Fulshear Transportation Visual Recording (Complete)

 

BLUE TRACK

Lamar CHS Tennis Courts (Complete)

Austin ES Additions & Renovations (Complete)

  1. New Security Vestibule
  2. Add curtain to stage; renovate student restrooms; repair walls and floors due to leveling; replace doors and hardware; video and repair sanitary sewer lines; video access control; replace sound system

RED TRACK

Bowie ES & Beasley ES Additions & Renovations (Complete)

  1. Bowie ES- Repair walls; replace exterior windows; renovate restrooms; replace boiler, fan coil units, air handlers and split system A/C’s; replace intercom; upgrade LED lighting
  2. Bowie ES- New Secure Vestibule Addition
  3. Bowie ES - Install ADA playground ramp; replace exterior doors and windows
  4. Beasley ES - Repair gym floor; replace ceiling in portable; install ADA playground ramp; replace stage curtain; replace casework in teacher’s lounge; upgrade circuit breakers and LED lighting
  5. Beasley ES - New Secure Vestibule Addition

GOLD TRACK

Jackson ES Additions & Renovations (Complete)

  1. Repair structural issues; upgrade LED lighting; upgrade electrical panel; sound system/additional cameras
  2. Replace roof; replace wall cladding; replace exterior windows
  3. New Secure Vestibule Addition

Jackson ES Playground (Complete)

 

MAROON TRACK

Dickinson ES, Campbell ES & Williams ES Add. & Renovations (Complete)

  1. Williams ES – Add parent drop-off canopy
  2. Williams ES – Add new concrete bus drive; replace exterior windows
  3. Dickinson ES - Repair concrete sidewalk and curb
  4. Campbell ES - Replace chalk boards with white boards; address foundation issues; install VFD on heating water pumps; replace heating water piping and heating water pumps

Dickinson ES & Campbell ES Re-Roof (Complete)

  1. Dickinson ES – Replace Roof
  2. Campbell ES– Replace Roof

PURPLE TRACK

Huggins ES Additions & Renovations (Complete)

  1. Replace sanitary sewer lines; upgrade LED lighting; sound system
  2. Replace roof; replace exterior windows, access control near portables
  3. New Secure Vestibule Addition

SILVER TRACK

Randle HS Shell Space Build-Out (Complete)

Cloud Site